Canacol Energy has announced that Clarinete 1, the first exploration well drilled in its recently acquired VIM 5 Exploration and Production (E&P) Contract, has tested at a final gross rate of 24.7 million standard cubic feet per day (mmscfpd) of dry gas with no water from the Upper Cienaga de Oro (CDO) reservoir in the second of two production tests over two separate reservoir intervals